Complete turnkey implementation
Complex implementation on a turnkey basis with the supply of a cooling tower, a pumping group and an automatic control system.
Part of the equipment:
- 3-section cooling tower.
- The capacity of each section is 333 m3/h.
- The total productivity is 1000 m3/h.