Complete turnkey implementation

Complex implementation on a turnkey basis with the supply of a cooling tower, a pumping group and an automatic control system.

Part of the equipment:
  • 3-section cooling tower.
  • The capacity of each section is 333 m3/h.
  • The total productivity is 1000 m3/h.